Our environmental interventions in Sa Piramide
At the Sa Piramide site, we carried out permanent safety measures at the former landfill site and we are promoting the area's valorisation.
From the remediation of the former landfill to new projects for the territory
Sa Piramide at a glance
Sa Piramide past and present
Site history
Start of environmental interventions
Eni Rewind carried out on the site permanent safety measures (MISP).
Landfill acrivities are ceased
The former Sa Piramide landfill site was declared obsolete in 1992.
The site is transferred to Eni
The Sa Piramide area was incorporated into Enirisorse (Eni group) in 1978.
Landfill in activity
The Sa Piramide landfill was in activity between 1971 and 1992 as a waste disposal site for the Portovesme metallurgical hub.
Our activities at Sa Piramide
The former Sa Piramide landfill site was declared obsolete in 1992, and the safety measures carried out included covering it with HDPE sheeting, filling it with soil and vegetation, regulating rainwater, collecting leachate in a storage tank and discharging it into the water treatment plant at the adjacent factory. In 2001, following some problems with the surface insulation, in agreement with the Sardinia Region we have prepared and presented a remediation project with permanent safety measures. Activities was carried out between 2004 and 2009, and included the confinement of the former landfill with waterproof barriers, both at the top and at the sides, the installation of a waste water drainage system and an increase in prevention measures for the groundwater.
We are currently managing the post-operational phase of the permanent safety measures with a 30-year duration. Activities include maintenance of the structure and water monitoring with pumping from three wells outside the former landfill. The piezometers network allows the monitoring of both groundwater and residual water within the safety measures enclosure, below the capping, and upstream of the diaphragm wall. A definitive solution for the management of the site's residual water and groundwater is currently being evaluated with the authorities and the Sulcis-Iglesiente Industrial Consortium.
The Sulcis Iglesiente Guspinese Site of National Priority

Status of the environmental process
In 2009, the permanent safety masures and environmental recovery of the former Sa Piramide landfill was completed. In 2022, the Province issued the remediation certificate. We are currently managing the post-operational phase.
Project approved
Definitive project for permanent safety measures and environmental recovery approved by the Municipality of Portoscuso in 2003. Certification of completed remediation issued by the Province of Southern Sardinia in June 2022.
rilasciata dalla Provincia del Sud Sardegna nel giugno 2022.

Project approved